王家远
Personal information
Professional Title:Professor
Journal Paper
- [1]Schedule risk analysis of infrastructure projects: A hybrid dynamic approach.,Automation in Construction,.
- [2]Considering life-cycle environmental impacts and society's willingness for optimizing construction and demolition waste management fee: An empirical study of China,JOURNAL OF CLEANER PRODUCTION,2019-01-01.
- [3]Combining life cycle assessment and Building Information Modelling to account for carbon emission of building demolition waste: A case study,JOURNAL OF CLEANER PRODUCTION,2019-01-01.
- [4]Identifying the Critical Risks in Railway Projects Based on Fuzzy and Sensitivity Analysis: A Case Study of Belt and Road Projects,SUSTAINABILITY,2019-03-01.
- [5]Prediction of large-scale demolition waste generation during urban renewal: A hybrid trilogy method,WASTE MANAGEMENT,2019-04-01.
- [6]Critical factors affecting willingness of design units towards construction waste minimization: An empirical study in Shenzhen, China,JOURNAL OF CLEANER PRODUCTION,2019-06-01.
- [7]建筑废料分类分拣的制约因素,城市问题,.
- [8]基于系统动力学的建筑废料管理模型,系统工程理论与实践,.
- [9]主成分分析法评价地区建筑业竞争力,深圳大学学报(理工版),.
- [10]基于系统动力学的建筑废料分类分拣管理模型,科技进步与对策,.